Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
492
matching recommendationsNAICS | 326299 | All Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0351 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $2,396 | $290 | Not Implemented |
SF0351 # 07 Y:2008 | 07 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,173 | $228 | Not Implemented |
SF0351 # 08 Y:2008 | 08 | 2008 | INSULATE BARE EQUIPMENT | $685 | $503 | Not Implemented |
SF0351 # 09 Y:2008 | 09 | 2008 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,877 | $2,802 | Not Implemented |
SF0351 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,144 | $1,792 | Not Implemented |
SF0351 # 11 Y:2008 | 11 | 2008 | INSULATE BARE EQUIPMENT | $493 | $979 | Not Implemented |
SF0351 # 12 Y:2008 | 12 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,836 | $93,064 | Implemented |
MI0158 # 01 Y:2007 | 01 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $92,023 | $8,580 | Implemented |
MI0158 # 02 Y:2007 | 02 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $55,437 | $101,347 | Implemented |
MI0158 # 03 Y:2007 | 03 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,358 | $46,238 | Not Implemented |
MI0158 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,963 | $20,900 | Implemented |
MI0158 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,507 | $1,210 | Implemented |
MI0158 # 06 Y:2007 | 06 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $13,330 | $1,700 | Implemented |
MI0158 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,478 | $5,967 | Not Implemented |
MI0158 # 08 Y:2007 | 08 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,282 | $3,475 | Not Implemented |
MI0158 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,073 | $40 | Implemented |
MI0158 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,886 | $2,000 | Implemented |
CO0600 # 01 Y:2007 | 01 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,230 | $1,140 | Not Implemented |
CO0600 # 02 Y:2007 | 02 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,710 | $150 | Implemented |
CO0600 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $620 | $60 | Implemented |
CO0600 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $190 | Implemented |
CO0600 # 05 Y:2007 | 05 | 2007 | INSTALL COMMON HEADER ON COMPRESSORS | $320 | $3,450 | Implemented |
CO0600 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,770 | $12,130 | Not Implemented |
CO0600 # 07 Y:2007 | 07 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,560 | $11,000 | Implemented |
CO0600 # 08 Y:2007 | 08 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,050 | $6,160 | Not Implemented |