Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
492
matching recommendationsNAICS | 326299 | All Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0532 # 09 Y:2016 | 09 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $806 | $235 | Implemented |
WV0532 # 10 Y:2016 | 10 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $811 | $0 | Implemented |
WV0532 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $796 | $795 | Implemented |
WV0532 # 12 Y:2016 | 12 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $530 | $2,500 | Not Implemented |
WV0532 # 13 Y:2016 | 13 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $145 | $25 | Implemented |
UD0943 # 09 Y:2016 | 09 | 2016 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $12,350 | $0 | Not Implemented |
UD0943 # 01 Y:2016 | 01 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $32,216 | $700 | Not Implemented |
UD0943 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,548 | $2,400 | Implemented |
UD0943 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,300 | $0 | Implemented |
UD0943 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $0 | Implemented |
UD0943 # 05 Y:2016 | 05 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $196 | $800 | Not Implemented |
UD0943 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $24,866 | $81,180 | Not Implemented |
UD0943 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,294 | $4,525 | Not Implemented |
UD0943 # 08 Y:2016 | 08 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $411 | $2,031 | Not Implemented |
WV0505 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,298 | $6,690 | Implemented |
WV0505 # 02 Y:2015 | 02 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,729 | $22,950 | Not Implemented |
WV0505 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,348 | $8,583 | Implemented |
WV0505 # 04 Y:2015 | 04 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,847 | $1,000 | Implemented |
WV0505 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,847 | $345 | Implemented |
WV0505 # 06 Y:2015 | 06 | 2015 | INSULATE BARE EQUIPMENT | $4,707 | $1,730 | Not Implemented |
WV0505 # 07 Y:2015 | 07 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,601 | $1,700 | Implemented |
WV0505 # 08 Y:2015 | 08 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,549 | $0 | Not Implemented |
WV0505 # 09 Y:2015 | 09 | 2015 | INSTALL SET-BACK TIMERS | $2,219 | $1,175 | Not Implemented |
WV0505 # 10 Y:2015 | 10 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,063 | $35 | Implemented |
WV0505 # 11 Y:2015 | 11 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,699 | $672 | Implemented |