IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 326299 All Other Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0298 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,913 $4,400 n/a
IC0298 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,466 $2,200 n/a
IC0298 # 11 Y:2024 11 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,685 $6,178 n/a
IC0298 # 10 Y:2024 10 2024 INSULATE BARE EQUIPMENT $18,765 $12,716 n/a
IC0298 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $259 $259 n/a
IC0298 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $63 $0 n/a
IC0298 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $352 $0 n/a
IC0298 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,839 $0 n/a
IC0298 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $216,800 $1,202,971 n/a
IC0298 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,618 $558 n/a
IC0298 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $3,568 $280 n/a
UD0853 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $6,272 $6,000 Not Implemented
UD0853 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,192 $5,500 Not Implemented
UD0853 # 03 Y:2012 03 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $15,738 $600 Not Implemented
UD0853 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $3,815 Not Implemented
UD0853 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,419 $28,511 Not Implemented
UD0853 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,059 $7,000 Not Implemented
UD0853 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,012 $1,000 Not Implemented
UD0853 # 11 Y:2012 11 2012 COVER OPEN TANKS $4,120 $200 Not Implemented
UD0853 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,076 $9,000 Not Implemented
UD0853 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,506 $1,000 Not Implemented
UD0853 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $974 $2,000 Not Implemented
UD0853 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $1,300 Not Implemented
UD0751 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,112 $0 Not Implemented
UD0751 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63,687 $0 Implemented