Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 326299 | All Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0060 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $460 | $83 | Not Implemented |
TA0060 # 06 Y:2003 | 06 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $670 | $1,060 | Not Implemented |
TA0060 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $2,140 | $506 | Not Implemented |
TA0060 # 04 Y:2003 | 04 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,700 | $0 | Not Implemented |
TA0060 # 03 Y:2003 | 03 | 2003 | PAY UTILITY BILLS ON TIME | $4,647 | $0 | Not Implemented |
TA0060 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,880 | $150 | Not Implemented |
TA0060 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,300 | $11,530 | Not Implemented |
OK0658 # 10 Y:2003 | 10 | 2003 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $7,445 | $0 | Not Implemented |
OK0658 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $6,270 | $2,004 | Implemented |
OK0658 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,609 | $30,876 | Implemented |
OK0658 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,028 | $117 | Not Implemented |
OK0658 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,150 | $5,273 | Implemented |
OK0658 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,978 | $367 | Implemented |
OK0658 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,031 | $0 | Implemented |
OK0658 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $51,704 | $45,000 | Implemented |
OK0658 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,266 | $0 | Not Implemented |
OK0658 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $30,454 | $60,000 | Not Implemented |
SF0256 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $382 | $1,618 | Not Implemented |
SF0256 # 08 Y:2003 | 08 | 2003 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $975 | $1,800 | Not Implemented |
SF0256 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $801 | $5,231 | Not Implemented |
SF0256 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $11,466 | $7,440 | Not Implemented |
SF0256 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $2,150 | $5,160 | Not Implemented |
SF0256 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,197 | $8,880 | Not Implemented |
SF0256 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $593 | $433 | Not Implemented |
SF0256 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,773 | $636 | Not Implemented |