IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0463 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,966 $4,800 Implemented
SU0463 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,314 $8,600 Not Implemented
SU0463 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,345 $14,020 Not Implemented
SU0431 # 01 Y:2016 01 2016 DISCONNECT BALLASTS $270 $0 Implemented
SU0431 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,312 $0 Implemented
SU0431 # 03 Y:2016 03 2016 INSULATE FEEDWATER TANK $162 $56 Implemented
SU0431 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $10,608 $4,074 Not Implemented
SU0431 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $388 Not Implemented
SU0431 # 06 Y:2016 06 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $428 $991 Implemented
SU0431 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $393 Implemented
SU0431 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $757 $3,080 Implemented
SU0311 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $379 $0 Implemented
SU0311 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,621 $1,125 Implemented
SU0311 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,682 $3,759 Implemented
SU0311 # 04 Y:2011 04 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,617 $15,000 Not Implemented
SU0311 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,276 $19,890 Implemented
SU0311 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $111 $313 Not Implemented
SU0311 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $2,386 $21,091 Implemented
SU0292 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,577 $0 Not Implemented
SU0292 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $4,309 $46 Implemented
SU0292 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,292 $962 Implemented
SU0292 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,754 $5,714 Not Implemented
SU0292 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $274 $560 Not Implemented
SU0292 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,377 $81,156 Not Implemented
SU0292 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $57,316 $175,000 Not Implemented