Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,688
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0547 # 11 Y:2017 | 11 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $133 | $25 | Not Implemented |
WV0547 # 12 Y:2017 | 12 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $102 | $348 | Not Implemented |
GT0898 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,203 | $150 | Not Implemented |
GT0898 # 02 Y:2017 | 02 | 2017 | METER WASTE WATER | $38,607 | $18,000 | Implemented |
GT0898 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,648 | $9,390 | Implemented |
GT0898 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,223 | $8,011 | Not Implemented |
GT0898 # 05 Y:2017 | 05 | 2017 | USE SOLAR HEAT FOR HEAT | $42,901 | $150,153 | Not Implemented |
MA0774 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $58,825 | $627,522 | Implemented |
MA0774 # 02 Y:2017 | 02 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,851 | $21,075 | Not Implemented |
MA0774 # 03 Y:2017 | 03 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,135 | $27,198 | Not Implemented |
MA0774 # 04 Y:2017 | 04 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,868 | $652 | Implemented |
MA0774 # 05 Y:2017 | 05 | 2017 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,908 | $1,775 | Implemented |
AS0438 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,271 | $100 | Implemented |
AS0438 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,534 | $60 | Not Implemented |
AS0438 # 03 Y:2017 | 03 | 2017 | USE SYNTHETIC LUBRICANT | $490 | $609 | Not Implemented |
AS0438 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,583 | $45,665 | Implemented |
AS0438 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $1,028 | $329 | Implemented |
AS0438 # 06 Y:2017 | 06 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $2,028 | $7,653 | Not Implemented |
LE0435 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,125 | $20 | Implemented |
LE0435 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,469 | $1,000 | Implemented |
LE0435 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,249 | $3,100 | Not Implemented |
LE0435 # 04 Y:2017 | 04 | 2017 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $18,948 | $76,000 | Not Implemented |
LE0435 # 05 Y:2017 | 05 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,092 | $23,000 | Implemented |
AM0725 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,400 | $262,500 | Implemented |
AM0725 # 02 Y:2017 | 02 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $27,250 | $15,000 | Implemented |