Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1037 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,323 $0 Implemented
UD1037 # 04 Y:2022 04 2022 INSTALL AUTOMATIC STACK DAMPER $4,890 $2,000 Not Implemented
UD1037 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $657 $1,500 Not Implemented
UD1037 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,459 $0 Not Implemented
UD1037 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,245 $0 Not Implemented
UD1037 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,378 $0 Not Implemented
UD1037 # 05 Y:2022 05 2022 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $26,903 $30,000 Not Implemented
UD1037 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,275 $14,400 Implemented
UD1037 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,006 $6,975 Implemented
CW0116 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $90 Implemented
CW0116 # 07 Y:2020 07 2020 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $438 $0 Implemented
CW0116 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $1,350 Not Implemented
CW0116 # 05 Y:2020 05 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,030 $19,360 Not Implemented
CW0116 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $46 $0 Implemented
CW0116 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $752 $70 Implemented
CW0116 # 06 Y:2020 06 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,657 $2,615 Not Implemented
UD1022 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $64,635 $158,400 Not Implemented
UD1022 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $3,209 $3,730 Not Implemented
UD1022 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,150 $75,000 Not Implemented
UD1022 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,140 $340 Not Implemented
UD1022 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,787 $14,000 Not Implemented
UD1022 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $39,643 $10,000 Not Implemented
UD1022 # 02 Y:2020 02 2020 ADJUST BURNERS FOR EFFICIENT OPERATION $333,038 $10,000 Not Implemented
UD1022 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,420 $0 Not Implemented
WV0528 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,004 $325 Implemented