IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1049 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $820 Implemented
OK1049 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $5,159 $6,000 Not Implemented
OK1049 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,601 $1,060 Implemented
OK1049 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $0 Implemented
OK1042 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $303 $1,200 Not Implemented
OK1042 # 03 Y:2021 03 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $178 $308 Not Implemented
OK1042 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $0 Implemented
OK1042 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,084 $813 Not Implemented
OK0981 # 05 Y:2018 05 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $353,111 $2,500,000 Not Implemented
OK0981 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,343 $69,050 Not Implemented
OK0981 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,309 $4,937 Not Implemented
OK0981 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,815 $0 Not Implemented
OK0981 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $124,716 $75,000 Implemented
OK0981 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $11,423 $50,570 Not Implemented
OK0898 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $11,014 Not Implemented
OK0898 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,345 $5,971 Not Implemented
OK0898 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $12,191 $15,000 Not Implemented
OK0898 # 02 Y:2014 02 2014 INSTALL SET-BACK TIMERS $3,689 $1,965 Not Implemented
OK0898 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,132 $1,689 Implemented
OK0898 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $303 $270 Implemented
OK0898 # 11 Y:2014 11 2014 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $89,952 $75,900 Not Implemented
OK0898 # 09 Y:2014 09 2014 INSULATE BARE EQUIPMENT $90 $178 Not Implemented
OK0898 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $463 Implemented
OK0898 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $6,545 $27,400 Implemented
OK0898 # 08 Y:2014 08 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,045 $1,060 Not Implemented