Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
122
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0144 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,747 | $85 | Implemented |
IP0144 # 02 Y:2020 | 02 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,096 | $0 | Implemented |
IP0144 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $194 | $195 | Implemented |
IP0144 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,556 | $0 | Implemented |
IP0144 # 04 Y:2020 | 04 | 2020 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $8,469 | $3,263 | Not Implemented |
IP0144 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,442 | $22,030 | Implemented |
SD0603 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,309 | $3,594 | Implemented |
SD0603 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,190 | $4,000 | Implemented |
SD0603 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,802 | $6,300 | Implemented |
SD0603 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,364 | $5,800 | Implemented |
CW0116 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $752 | $70 | Implemented |
CW0116 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $342 | $1,350 | Not Implemented |
CW0116 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $138 | $90 | Implemented |
CW0116 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $46 | $0 | Implemented |
CW0116 # 05 Y:2020 | 05 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,030 | $19,360 | Not Implemented |
CW0116 # 06 Y:2020 | 06 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,657 | $2,615 | Not Implemented |
CW0116 # 07 Y:2020 | 07 | 2020 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $438 | $0 | Implemented |
WV0603 # 07 Y:2020 | 07 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,613 | $30 | Not Implemented |
WV0603 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $10,297 | $13,192 | Not Implemented |
WV0603 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,223 | $1,300 | Not Implemented |
WV0603 # 10 Y:2020 | 10 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $474 | $1,450 | Not Implemented |
WV0603 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,058 | $3,394 | Not Implemented |
WV0603 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $8,141 | $1,391 | Not Implemented |
WV0603 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $335,278 | $8,838 | Not Implemented |
WV0603 # 03 Y:2020 | 03 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $11,834 | $1,018 | Not Implemented |