Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
634
matching recommendationsNAICS | 3271 | Clay Product and Refractory Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0546 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,466 | $100 | n/a |
WV0635 # 05 Y:2022 | 05 | 2022 | INSTALL SET-BACK TIMERS | $3,167 | $1,125 | Not Implemented |
WV0635 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $546 | $1,571 | Implemented |
WV0635 # 09 Y:2022 | 09 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $672 | $1,500 | Implemented |
WV0635 # 11 Y:2022 | 11 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $57 | $88 | Implemented |
WV0635 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,309 | $218 | Implemented |
WV0635 # 04 Y:2022 | 04 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $3,209 | $6,354 | Not Implemented |
WV0635 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $4,945 | Implemented |
WV0635 # 02 Y:2022 | 02 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,325 | $5,360 | Not Implemented |
WV0635 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,179 | $6,500 | Not Implemented |
WV0635 # 07 Y:2022 | 07 | 2022 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,027 | $394 | Implemented |
WV0635 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $949 | $525 | Implemented |
UA0254 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,515 | $12,000 | Not Implemented |
UA0254 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,608 | $2,502 | Implemented |
UA0254 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,108 | $47,329 | Implemented |
UA0253 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,821 | $3,299 | Not Implemented |
UA0253 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,681 | $14,236 | Implemented |
UA0253 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,709 | $1,000 | Implemented |
UA0253 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $595 | $84 | Not Implemented |
UA0253 # 06 Y:2022 | 06 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $497 | $510 | Not Implemented |
UA0253 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,756 | $9,801 | Implemented |
TT0267 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,038 | $18,000 | Implemented |
TT0267 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,631 | $17,010 | Implemented |
TT0267 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $17,048 | $14,849 | Implemented |
TT0267 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,510 | $12,000 | Not Implemented |