IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
NAICS 32711 Pottery, Ceramics, and Plumbing Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0616 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $61,055 $261,561 n/a
SF0616 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $551 $550 n/a
SF0616 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $292 $292 n/a
SF0616 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,331 $1,971 n/a
WV0635 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,309 $218 Implemented
WV0635 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $4,945 Implemented
WV0635 # 02 Y:2022 02 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $4,325 $5,360 Not Implemented
WV0635 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,179 $6,500 Not Implemented
WV0635 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $57 $88 Implemented
WV0635 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $3,167 $1,125 Not Implemented
WV0635 # 07 Y:2022 07 2022 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,027 $394 Implemented
WV0635 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $949 $525 Implemented
WV0635 # 09 Y:2022 09 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $672 $1,500 Implemented
WV0635 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $3,209 $6,354 Not Implemented
WV0635 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $546 $1,571 Implemented
UD1022 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $39,643 $10,000 Not Implemented
UD1022 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $64,635 $158,400 Not Implemented
UD1022 # 02 Y:2020 02 2020 ADJUST BURNERS FOR EFFICIENT OPERATION $333,038 $10,000 Not Implemented
UD1022 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,420 $0 Not Implemented
UD1022 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,787 $14,000 Not Implemented
UD1022 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,140 $340 Not Implemented
UD1022 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,150 $75,000 Not Implemented
UD1022 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $3,209 $3,730 Not Implemented
NL0051 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $418 $1,250 Not Implemented
NL0051 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $631 $500 Implemented