IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
NAICS 32711 Pottery, Ceramics, and Plumbing Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0420 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,785 $0 Implemented
NC0420 # 06 Y:2011 06 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,434 $55,000 Implemented
NC0420 # 07 Y:2011 07 2011 USE AUTOMATIC FLOW CONTROL $377,830 $3,425 Not Implemented
WV0418 # 03 Y:2010 03 2010 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $69,991 $24,464 Not Implemented
WV0418 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $138,747 $25,000 Not Implemented
WV0418 # 02 Y:2010 02 2010 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $81,321 $88,248 Not Implemented
WV0418 # 04 Y:2010 04 2010 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $44,522 $17,594 Not Implemented
WV0418 # 05 Y:2010 05 2010 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $35,021 $47,775 Not Implemented
WV0418 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $22,652 $9,549 Implemented
WV0418 # 06 Y:2010 06 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $33,207 $16,040 Not Implemented
WV0418 # 18 Y:2010 18 2010 IMPROVE LUBRICATION PRACTICES $370 $466 Implemented
WV0418 # 17 Y:2010 17 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $866 $2,717 Implemented
WV0418 # 16 Y:2010 16 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,116 $0 Implemented
WV0418 # 15 Y:2010 15 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,931 $0 Implemented
WV0418 # 14 Y:2010 14 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,456 $621 Implemented
WV0418 # 13 Y:2010 13 2010 RECOVER WASTE HEAT FROM EQUIPMENT $6,837 $3,870 Not Implemented
WV0418 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,456 $5,095 Implemented
WV0418 # 08 Y:2010 08 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $17,763 $2,000 Implemented
WV0418 # 09 Y:2010 09 2010 DEVELOP A REPAIR/REPLACE POLICY $15,821 $1,715 Implemented
WV0418 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,872 $35,956 Implemented
WV0418 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,568 $19,614 Implemented
SU0292 # 10 Y:2010 10 2010 MOVE BOILER TO MORE EFFICIENT LOCATION $6,648 $60,575 Not Implemented
SU0292 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,577 $0 Not Implemented
SU0292 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,377 $81,156 Not Implemented
SU0292 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $57,316 $175,000 Not Implemented