IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

395

matching recommendations
Reset
NAICS 32712 Clay Building Material and Refractories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0267 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,489 $1,920 Not Implemented
TT0267 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,048 $14,849 Implemented
TT0267 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,510 $12,000 Not Implemented
SU0509 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $0 Not Implemented
SU0509 # 09 Y:2022 09 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $1,479 Not Implemented
SU0509 # 12 Y:2022 12 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $199 $413 Not Implemented
SU0509 # 11 Y:2022 11 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $51 $85 Not Implemented
SU0509 # 10 Y:2022 10 2022 ELIMINATE/REDUCE AN OPERATION $1,433 $2,000 Not Implemented
SU0509 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,797 $10,808 Not Implemented
SU0509 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $3,507 $0 Not Implemented
SU0509 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $478 $485 Not Implemented
SU0509 # 06 Y:2022 06 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,401 $327 Not Implemented
SU0509 # 05 Y:2022 05 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $332 $35 Not Implemented
SU0509 # 04 Y:2022 04 2022 REDUCE VENTILATION AIR $6,046 $882 Not Implemented
SU0509 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $46 $0 Not Implemented
SD0609 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,216 $2,319 Not Implemented
SD0609 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,053 $225 Not Implemented
SD0609 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,886 $1,396 Not Implemented
SD0609 # 05 Y:2021 05 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $308 $920 Not Implemented
SD0609 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $821 $0 Not Implemented
TT0243 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $294,548 $574,658 Implemented
TT0243 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $63,580 $248,619 Not Implemented
TT0243 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,111 $600 Implemented
TT0243 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $84,184 $2,000 Not Implemented
TT0243 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $45,344 $83,600 Not Implemented