IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

395

matching recommendations
Reset
NAICS 32712 Clay Building Material and Refractories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0087 # 14 Y:2012 14 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,937 $23,284 Implemented
TT0087 # 15 Y:2012 15 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,403 $10,218 Implemented
TT0087 # 16 Y:2012 16 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $858 $7,176 Implemented
TT0087 # 17 Y:2012 17 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,120 $3,120 Not Implemented
TT0087 # 18 Y:2012 18 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $342 $595 Not Implemented
SU0311 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $379 $0 Implemented
SU0311 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,621 $1,125 Implemented
SU0311 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,682 $3,759 Implemented
SU0311 # 04 Y:2011 04 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,617 $15,000 Not Implemented
SU0311 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,276 $19,890 Implemented
SU0311 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $111 $313 Not Implemented
SU0311 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $2,386 $21,091 Implemented
GT0878 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,600 $8,000 Implemented
GT0878 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $77,000 $12,000 Not Implemented
GT0878 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,919 $63,600 Not Implemented
LE0307 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,369 $20,000 Not Implemented
LE0307 # 02 Y:2010 02 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,231 $30,000 Not Implemented
LE0307 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $15,010 $125 Implemented
LE0307 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,218 $47,450 Not Implemented
LE0307 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,286 $800 Implemented
UD0825 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,398 $100 Not Implemented
UD0825 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,976 $2,000 Not Implemented
UD0825 # 03 Y:2010 03 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,869 $10,000 Not Implemented
UD0825 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,525 $100 Not Implemented
UD0825 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,681 $25 Not Implemented