IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 32712 Clay Building Material and Refractories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0307 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,369 $20,000 Not Implemented
LE0307 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $15,010 $125 Implemented
LE0307 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,218 $47,450 Not Implemented
LE0307 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,286 $800 Implemented
LE0307 # 02 Y:2010 02 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,231 $30,000 Not Implemented
UD0825 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $60 Not Implemented
UD0825 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,525 $100 Not Implemented
UD0825 # 06 Y:2010 06 2010 AVOID REWINDING MOTORS MORE THAN TWICE $783 $971 Not Implemented
UD0825 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $268 $75 Not Implemented
UD0825 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,681 $25 Not Implemented
UD0825 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,398 $100 Not Implemented
UD0825 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,976 $2,000 Not Implemented
UD0825 # 03 Y:2010 03 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,869 $10,000 Not Implemented
UD0825 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,851 $13,500 Not Implemented
UD0825 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $5,151 $1,200 Not Implemented
AM0579 # 01 Y:2010 01 2010 DEVELOP STANDARD OPERATING PROCEDURES $1,058,450 $0 Not Implemented
AM0579 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $900 Not Implemented
AM0579 # 09 Y:2010 09 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,140 $12,387 Not Implemented
AM0579 # 08 Y:2010 08 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,415 $500 Not Implemented
AM0579 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,550 $1,000 Not Implemented
AM0579 # 06 Y:2010 06 2010 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,700,000 $0 Not Implemented
AM0579 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $12,300 $2,500 Not Implemented
AM0579 # 04 Y:2010 04 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $14,800 $2,500 Not Implemented
AM0579 # 03 Y:2010 03 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,100 $0 Not Implemented
AM0579 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,370 $48,100 Not Implemented