Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

395

matching recommendations
Reset
NAICS 327120 Clay Building Material and Refractories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0311 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,957 $30 n/a
TT0311 # 03 Y:2024 03 2024 RECOVER WASTE HEAT FROM EQUIPMENT $10,039 $16,000 n/a
TT0311 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,298 $1,735 n/a
TT0311 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,792 $3,400 n/a
TT0311 # 07 Y:2024 07 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $510 $0 n/a
TT0311 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,187 $9,000 n/a
TT0311 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $52,706 $69,233 n/a
SU0546 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,466 $100 n/a
SU0546 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $626 $0 n/a
SU0546 # 04 Y:2023 04 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $559 $253 n/a
SU0546 # 01 Y:2023 01 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,882 $0 n/a
UA0254 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,608 $2,502 Implemented
UA0254 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $12,000 Not Implemented
UA0254 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,108 $47,329 Implemented
UA0253 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $497 $510 Not Implemented
UA0253 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $9,801 Implemented
UA0253 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $1,000 Implemented
UA0253 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,821 $3,299 Not Implemented
UA0253 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,681 $14,236 Implemented
UA0253 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $595 $84 Not Implemented
TT0267 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,797 $5,000 Not Implemented
TT0267 # 06 Y:2022 06 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,445 $5,000 Not Implemented
TT0267 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,048 $14,849 Implemented
TT0267 # 01 Y:2022 01 2022 DIRECT WARMEST AIR TO COMBUSTION INTAKE $67,587 $45,000 Not Implemented
TT0267 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,631 $17,010 Implemented