IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
NAICS 327120 Clay Building Material and Refractories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0254 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,108 $47,329 Implemented
UA0254 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,608 $2,502 Implemented
UA0253 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $1,000 Implemented
UA0253 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,681 $14,236 Implemented
UA0253 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $9,801 Implemented
TT0267 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,631 $17,010 Implemented
TT0267 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,038 $18,000 Implemented
TT0267 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,048 $14,849 Implemented
TT0243 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,111 $600 Implemented
TT0243 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $294,548 $574,658 Implemented
SD0591 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,259 $75 Implemented
SU0467 # 03 Y:2018 03 2018 ELIMINATE/REDUCE AN OPERATION $6,396 $3,593 Implemented
SU0467 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,806 $10,588 Implemented
SU0467 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $86 $0 Implemented
SU0467 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $375 Implemented
SU0467 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,680 $1,169 Implemented
UA0196 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $7,511 $3,443 Implemented
UA0196 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $894 $550 Implemented
UA0196 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,798 $1,165 Implemented
UA0196 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $1,227 Implemented
SU0431 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $393 Implemented
SU0431 # 06 Y:2016 06 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $428 $991 Implemented
SU0431 # 01 Y:2016 01 2016 DISCONNECT BALLASTS $270 $0 Implemented
SU0431 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,312 $0 Implemented
SU0431 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $757 $3,080 Implemented