Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 327120 | Clay Building Material and Refractories Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0307 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,286 | $800 | Implemented |
LE0307 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,218 | $47,450 | Not Implemented |
LE0307 # 03 Y:2010 | 03 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $15,010 | $125 | Implemented |
LE0307 # 02 Y:2010 | 02 | 2010 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $20,231 | $30,000 | Not Implemented |
LE0307 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,369 | $20,000 | Not Implemented |
UD0825 # 10 Y:2010 | 10 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,151 | $1,200 | Not Implemented |
UD0825 # 09 Y:2010 | 09 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,851 | $13,500 | Not Implemented |
UD0825 # 08 Y:2010 | 08 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $60 | Not Implemented |
UD0825 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $268 | $75 | Not Implemented |
UD0825 # 06 Y:2010 | 06 | 2010 | AVOID REWINDING MOTORS MORE THAN TWICE | $783 | $971 | Not Implemented |
UD0825 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,681 | $25 | Not Implemented |
UD0825 # 04 Y:2010 | 04 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,525 | $100 | Not Implemented |
UD0825 # 03 Y:2010 | 03 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,869 | $10,000 | Not Implemented |
UD0825 # 02 Y:2010 | 02 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,976 | $2,000 | Not Implemented |
UD0825 # 01 Y:2010 | 01 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,398 | $100 | Not Implemented |
AM0579 # 01 Y:2010 | 01 | 2010 | DEVELOP STANDARD OPERATING PROCEDURES | $1,058,450 | $0 | Not Implemented |
AM0579 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,370 | $48,100 | Not Implemented |
AM0579 # 03 Y:2010 | 03 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,100 | $0 | Not Implemented |
AM0579 # 04 Y:2010 | 04 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $14,800 | $2,500 | Not Implemented |
AM0579 # 05 Y:2010 | 05 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $12,300 | $2,500 | Not Implemented |
AM0579 # 06 Y:2010 | 06 | 2010 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,700,000 | $0 | Not Implemented |
AM0579 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,550 | $1,000 | Not Implemented |
AM0579 # 08 Y:2010 | 08 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,415 | $500 | Not Implemented |
AM0579 # 09 Y:2010 | 09 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,140 | $12,387 | Not Implemented |
AM0579 # 10 Y:2010 | 10 | 2010 | USE SYNTHETIC LUBRICANT | $1,960 | $0 | Not Implemented |