IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 3272 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1049 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $5,159 $6,000 Not Implemented
OK1049 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,601 $1,060 Implemented
OK1049 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $0 Implemented
OK1049 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $820 Implemented
OK1042 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,084 $813 Not Implemented
OK1042 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $303 $1,200 Not Implemented
OK1042 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $0 Implemented
OK1042 # 03 Y:2021 03 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $178 $308 Not Implemented
OK0981 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $11,423 $50,570 Not Implemented
OK0981 # 05 Y:2018 05 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $353,111 $2,500,000 Not Implemented
OK0981 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $124,716 $75,000 Implemented
OK0981 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,815 $0 Not Implemented
OK0981 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,309 $4,937 Not Implemented
OK0981 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,343 $69,050 Not Implemented
OK0771 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,066 $0 Not Implemented
OK0771 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $2,875 Not Implemented
OK0771 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,458 $0 Not Implemented
OK0771 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,125 $3,460 Not Implemented
OK0771 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,463 $846 Not Implemented
OK0771 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $284 $1,213 Not Implemented
OK0771 # 07 Y:2008 07 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,068 $200 Not Implemented
OK0769 # 07 Y:2008 07 2008 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $451,827 $2,500,000 Not Implemented
OK0769 # 06 Y:2008 06 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,068 $200 Not Implemented
OK0769 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,911 $4,475 Implemented
OK0769 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98,641 $246,228 Not Implemented