Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsNAICS | 3272 | Glass and Glass Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0365 # 08 Y:2005 | 08 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $2,528 | $8,978 | Implemented |
UF0365 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,236 | $6,602 | Not Implemented |
UF0365 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,277 | $0 | Implemented |
UF0365 # 01 Y:2005 | 01 | 2005 | USE PHOTOCELL CONTROLS | $4,861 | $2,070 | Not Implemented |
UF0365 # 02 Y:2005 | 02 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,910 | $1,245 | Not Implemented |
UF0365 # 03 Y:2005 | 03 | 2005 | INSTALL SKYLIGHTS | $3,628 | $9,645 | Not Implemented |
UF0365 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,178 | $565 | Implemented |
UF0365 # 05 Y:2005 | 05 | 2005 | ADD AREA LIGHTING SWITCHES | $1,633 | $6,615 | Not Implemented |
MI0112 # 02 Y:2005 | 02 | 2005 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $89,581 | $90 | Implemented |
MI0112 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,504 | $1,393 | Implemented |
MI0112 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $319,237 | $91,320 | Not Implemented |
MI0112 # 04 Y:2005 | 04 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,289 | $600 | Implemented |
MI0112 # 03 Y:2005 | 03 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $19,066 | $8,226 | Implemented |
OK0711 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,068 | $25,248 | Not Implemented |
OK0711 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $333 | $647 | Not Implemented |
OK0711 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,907 | $3,150 | Not Implemented |
OK0711 # 04 Y:2005 | 04 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,929 | $125 | Not Implemented |
OK0711 # 05 Y:2005 | 05 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $8,800 | $0 | Not Implemented |
OK0711 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $846 | $811 | Not Implemented |
OK0711 # 07 Y:2005 | 07 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $215,784 | $8,400 | Not Implemented |
OK0711 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $603 | $4,626 | Not Implemented |
IA0365 # 05 Y:2005 | 05 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $628 | $1,600 | Implemented |
IA0365 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $779 | $19 | Implemented |
IA0365 # 07 Y:2005 | 07 | 2005 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $11,495 | $14,000 | Not Implemented |
IA0365 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $1,148 | $1,001 | Not Implemented |