IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 3272 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0136 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,741 $1,074 Implemented
MI0136 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,680 $100 Implemented
MI0136 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,010 $2,506 Not Implemented
MI0136 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,544 $146 Not Implemented
MI0136 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,760 $0 Implemented
MI0136 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,851 $40,224 Implemented
SU0238 # 12 Y:2006 12 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,004 $67,500 Not Implemented
SU0238 # 11 Y:2006 11 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $378 $684 Not Implemented
SU0238 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $86 $127 Implemented
SU0238 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $730 Implemented
SU0238 # 08 Y:2006 08 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,018 $1,094 Not Implemented
SU0238 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $264 Implemented
SU0238 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,073 $578 Implemented
SU0238 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $788 $0 Implemented
SU0238 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $1,534 $0 Not Implemented
SU0238 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,431 $0 Not Implemented
SU0238 # 02 Y:2006 02 2006 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $55,282 $0 Implemented
SU0238 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $98,366 $0 Implemented
GT0821 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $19,168 $0 Implemented
GT0821 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,498 $10,883 Not Implemented
GT0821 # 06 Y:2006 06 2006 REPAIR AND ELIMINATE STEAM LEAKS $7,286 $800 Implemented
GT0821 # 08 Y:2006 08 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $496 $1,050 Implemented
GT0821 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,292 $6,787 Implemented
GT0821 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $41,364 $117,000 Not Implemented
GT0821 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $274 $172 Implemented