Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsNAICS | 3272 | Glass and Glass Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0130 # 01 Y:2007 | 01 | 2007 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $12,768 | $40,352 | Not Implemented |
IC0130 # 07 Y:2007 | 07 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,363 | $231 | Not Implemented |
IC0130 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,983 | $790 | Not Implemented |
IC0130 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,094 | $1,096 | Not Implemented |
IC0130 # 02 Y:2007 | 02 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,486 | $1,890 | Not Implemented |
IC0130 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,652 | $21,323 | Not Implemented |
IC0130 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36 | $128 | Not Implemented |
IC0130 # 08 Y:2007 | 08 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,216 | $5,830 | Not Implemented |
IC0130 # 09 Y:2007 | 09 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $499 | $684 | Not Implemented |
IC0130 # 11 Y:2007 | 11 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,209 | $0 | Not Implemented |
IC0130 # 10 Y:2007 | 10 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,396 | $8,878 | Not Implemented |
MI0156 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,033 | $30 | Implemented |
MI0156 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,688 | $1,074 | Implemented |
MI0156 # 04 Y:2007 | 04 | 2007 | INSTALL SKYLIGHTS | $2,655 | $5,612 | Not Implemented |
MI0156 # 07 Y:2007 | 07 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $676 | $2,170 | Not Implemented |
MI0156 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,301 | $2,121 | Not Implemented |
MI0156 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,674 | $1,232 | Implemented |
MI0156 # 01 Y:2007 | 01 | 2007 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $7,785 | $1,800 | Not Implemented |
UW0002 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,263 | $85,000 | Not Implemented |
UW0002 # 02 Y:2007 | 02 | 2007 | OPTIMIZE PLANT POWER FACTOR | $10,893 | $16,323 | Not Implemented |
UW0002 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,000 | $9,385 | Implemented |
UW0002 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $153 | $200 | Implemented |
UW0002 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $5,998 | $2,692 | Implemented |
UW0002 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $700 | $252 | Implemented |
UW0002 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $906 | $653 | Not Implemented |