Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
757
matching recommendationsNAICS | 32721 | Glass and Glass Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0774 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $10,951 | $10,710 | Not Implemented |
OR0774 # 02 Y:2023 | 02 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $22,803 | $17,436 | Not Implemented |
OR0774 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $27,206 | $88,913 | Not Implemented |
OR0774 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,255 | $1,480 | Not Implemented |
OK1096 # 05 Y:2023 | 05 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,239 | $0 | Not Implemented |
OK1096 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $148,192 | $1,704,000 | Not Implemented |
OK1096 # 08 Y:2023 | 08 | 2023 | MAINTAIN MACHINES TO REDUCE LEAKS | $2,796 | $500 | Implemented |
OK1096 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $593 | $1,354 | Implemented |
OK1096 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,151 | $0 | Not Implemented |
OK1096 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,865 | $10,337 | Implemented |
OK1096 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,791 | $464,597 | Implemented |
OK1096 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $394,679 | $75,000 | Implemented |
SD0641 # 10 Y:2023 | 10 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,049 | $6,650 | Not Implemented |
SD0641 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $628 | $1,441 | Not Implemented |
SD0641 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,834 | $21,620 | Not Implemented |
SD0641 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,929 | $16,830 | Not Implemented |
SD0641 # 09 Y:2023 | 09 | 2023 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,019 | $7,800 | Not Implemented |
SD0641 # 03 Y:2023 | 03 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $2,501 | $11,000 | Not Implemented |
SD0641 # 05 Y:2023 | 05 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,325 | $8,632 | Not Implemented |
SD0641 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,189 | $70,634 | Implemented |
SD0641 # 12 Y:2023 | 12 | 2023 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $80,045 | $6,600 | Not Implemented |
SD0641 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $347 | $332 | Not Implemented |
SD0641 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $252 | $1,171 | Not Implemented |
SD0641 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,553 | $19,352 | Not Implemented |
WV0647 # 01 Y:2023 | 01 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $82,721 | $146,400 | Not Implemented |