IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0774 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $10,951 $10,710 Not Implemented
OR0774 # 02 Y:2023 02 2023 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $22,803 $17,436 Not Implemented
OR0774 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $27,206 $88,913 Not Implemented
OR0774 # 04 Y:2023 04 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,255 $1,480 Not Implemented
OK1096 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,239 $0 Not Implemented
OK1096 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $148,192 $1,704,000 Not Implemented
OK1096 # 08 Y:2023 08 2023 MAINTAIN MACHINES TO REDUCE LEAKS $2,796 $500 Implemented
OK1096 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $1,354 Implemented
OK1096 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,151 $0 Not Implemented
OK1096 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,865 $10,337 Implemented
OK1096 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,791 $464,597 Implemented
OK1096 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $394,679 $75,000 Implemented
SD0641 # 10 Y:2023 10 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,049 $6,650 Not Implemented
SD0641 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $628 $1,441 Not Implemented
SD0641 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,834 $21,620 Not Implemented
SD0641 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,929 $16,830 Not Implemented
SD0641 # 09 Y:2023 09 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $3,019 $7,800 Not Implemented
SD0641 # 03 Y:2023 03 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,501 $11,000 Not Implemented
SD0641 # 05 Y:2023 05 2023 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,325 $8,632 Not Implemented
SD0641 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $46,189 $70,634 Implemented
SD0641 # 12 Y:2023 12 2023 USE MORE EFFICIENT ADHESIVE APPLICATORS $80,045 $6,600 Not Implemented
SD0641 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $347 $332 Not Implemented
SD0641 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $252 $1,171 Not Implemented
SD0641 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,553 $19,352 Not Implemented
WV0647 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $82,721 $146,400 Not Implemented