IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0375 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,142 $8,160 Not Implemented
AM0638 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,980 $100 Implemented
AM0638 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,140 $2,200 Implemented
AM0638 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,400 $0 Not Implemented
AM0638 # 04 Y:2013 04 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $605 $350 Not Implemented
AM0638 # 05 Y:2013 05 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $560 $0 Implemented
AM0638 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $190 Implemented
MAS031 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $42,399 $35,000 Not Implemented
MAS031 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,552 $150 Implemented
MAS031 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,640 $200 Not Implemented
MAS031 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,556 $900 Not Implemented
MAS031 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $593 $425 Implemented
WM0014 # 01 Y:2012 01 2012 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,433 $47,000 Implemented
WM0014 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $233 $630 Implemented
WM0014 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,639 $513 Not Implemented
WM0014 # 04 Y:2012 04 2012 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $1,911 $8,170 Implemented
WM0007 # 01 Y:2012 01 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,505 $0 Not Implemented
WM0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $125 Implemented
WM0007 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,646 $0 Not Implemented
WM0007 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,789 $250 Not Implemented
WM0007 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,041 $200 Not Implemented
WM0007 # 06 Y:2012 06 2012 INSTALL SKYLIGHTS $34,161 $123,125 Not Implemented
MA0690 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $3,246 $1,750 Implemented
MA0690 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,986 $7,500 Not Implemented
MA0690 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,892 $4,075 Implemented