IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0754 # 07 Y:2018 07 2018 USE SYNTHETIC LUBRICANT $312 $0 Implemented
AM0754 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $123 $9 Implemented
SF0518 # 01 Y:2018 01 2018 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $13,874 $3,023 Not Implemented
SF0518 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,220 $4,857 Not Implemented
SF0518 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,611 $15,000 Not Implemented
SF0518 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $2,300 Not Implemented
SF0518 # 05 Y:2018 05 2018 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,098 $6,325 Not Implemented
SF0518 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $6,223 $45,702 Not Implemented
MZ0250 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,351 $5,600 Implemented
MZ0250 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $27,014 $65,000 Not Implemented
MZ0250 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,786 $280 Implemented
MZ0250 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,697 $0 Implemented
OK0981 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $124,716 $75,000 Implemented
OK0981 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,815 $0 Not Implemented
OK0981 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,309 $4,937 Not Implemented
OK0981 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,343 $69,050 Not Implemented
OK0981 # 05 Y:2018 05 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $353,111 $2,500,000 Not Implemented
OK0981 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $11,423 $50,570 Not Implemented
WV0547 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $15,992 $5,658 Implemented
WV0547 # 02 Y:2017 02 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $7,947 $25,500 Not Implemented
WV0547 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,491 $9,434 Implemented
WV0547 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,796 $1,263 Not Implemented
WV0547 # 05 Y:2017 05 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,360 $2,700 Not Implemented
WV0547 # 06 Y:2017 06 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $970 $4,600 Implemented
WV0547 # 07 Y:2017 07 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $563 $700 Not Implemented