IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0510 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,926 $45,000 Implemented
LE0510 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,951 $30,000 Implemented
LE0510 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,170 $21,000 Implemented
LE0510 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,596 $33,000 Not Implemented
LE0510 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,899 $12,800 Implemented
LE0510 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,653 $100,000 Implemented
LE0510 # 08 Y:2021 08 2021 REPLACE BOILER $334,294 $1,800,000 Implemented
LE0510 # 09 Y:2021 09 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $1,245,175 $9,990,000 Not Implemented
LE0510 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,017 $17,100 Implemented
LE0375 # 01 Y:2014 01 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,302 $0 Not Implemented
LE0375 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,973 $1,000 Not Implemented
LE0375 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $794 $450 Not Implemented
LE0375 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,600 $2,185 Not Implemented
LE0375 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $439 $550 Not Implemented
LE0375 # 08 Y:2014 08 2014 INSTALL COMMON HEADER ON COMPRESSORS $2,849 $10,313 Not Implemented
LE0375 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,522 $9,700 Not Implemented
LE0375 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,142 $8,160 Not Implemented
LE0375 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $7,827 $20,628 Not Implemented
SU0182 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,427 $0 Not Implemented
SU0182 # 02 Y:2004 02 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $174 $0 Implemented
SU0182 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,773 $381 Implemented
SU0182 # 04 Y:2004 04 2004 USE SYNTHETIC LUBRICANT $3,517 $1,200 Implemented
SU0182 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $2,158 $1,678 Not Implemented
LE0160 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,046 $0 Implemented
LE0160 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $457 $54 Not Implemented