IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0254 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132,788 $431,774 Not Implemented
TT0254 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $42,725 $52,500 Not Implemented
TT0254 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,052 $6,750 Not Implemented
TT0254 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,875 $4,500 Not Implemented
TT0254 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $7,171 $300 Not Implemented
TT0254 # 06 Y:2021 06 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,452 $1,923 Not Implemented
TT0248 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $7,421 $11,190 Implemented
TT0248 # 01 Y:2021 01 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $852,090 $500,000 Not Implemented
TT0248 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $43,748 $61,200 Not Implemented
TT0239 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,993 $173,628 Implemented
TT0239 # 08 Y:2020 08 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,217 $1,350 Not Implemented
TT0239 # 07 Y:2020 07 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,471 $2,000 Implemented
TT0239 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,142 $40 Implemented
TT0239 # 05 Y:2020 05 2020 INSTALL TIMERS AND/OR THERMOSTATS $5,210 $40 Not Implemented
TT0239 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,958 $1,500 Implemented
TT0239 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $11,285 $11,400 Not Implemented
TT0239 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,455 $1,630 Implemented
TT0148 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $11,009 $16,000 Not Implemented
TT0148 # 02 Y:2015 02 2015 INSTALL COMMON HEADER ON COMPRESSORS $11,774 $21,825 Not Implemented
TT0148 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $3,000 Implemented
TT0148 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $588 $1,182 Not Implemented
TT0148 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $315 Not Implemented
TT0148 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,871 $42,269 Implemented
TT0148 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $217 $470 Not Implemented
TT0148 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79 $158 Implemented