IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 327215 Glass Product Manufacturing Made of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0753 # 06 Y:2015 06 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $842 $2,152 Not Implemented
MA0753 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $1,226 $1,400 Implemented
MA0753 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,608 $4,608 Implemented
MA0753 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $4,632 $6,000 Implemented
MA0753 # 02 Y:2015 02 2015 REDUCE VENTILATION AIR $7,290 $5,575 Implemented
MA0753 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,534 $67,200 Not Implemented
UK1512 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,209 $3,940 Implemented
UK1512 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,559 $0 Implemented
UK1512 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,043 $1,215 Not Implemented
UK1512 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $4,650 Not Implemented
UK1512 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,263 $178 Not Implemented
UK1512 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,652 $1,750 Implemented
UK1512 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $4,297 $12,750 Not Implemented
UK1512 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,248 $7,985 Not Implemented
UK1512 # 09 Y:2015 09 2015 INSULATE FEEDWATER TANK $1,278 $994 Implemented
UK1512 # 10 Y:2015 10 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,609 $1,500 Implemented
UK1512 # 11 Y:2015 11 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,535 $530 Not Implemented
UK1512 # 12 Y:2015 12 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $475 Not Implemented
DL0142 # 02 Y:2015 02 2015 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,900 $0 Implemented
DL0142 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $16,089 $0 Implemented
DL0142 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $663 $3,900 Implemented
DL0142 # 04 Y:2015 04 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $21,578 $5,310 Implemented
DL0142 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $850 $8,225 Not Implemented
DL0142 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,065 $8,225 Not Implemented
DL0142 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $717 $1,890 Not Implemented