IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 3273 Cement and Concrete Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0204 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $97 $240 Implemented
WM0204 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $571 $750 Implemented
WM0204 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $651 $1,001 Not Implemented
WM0204 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,440 $2,330 Implemented
WM0204 # 01 Y:2023 01 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $22,875 $1,950 Not Implemented
WM0154 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,376 $54,000 Implemented
WM0154 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $599 $1,500 Implemented
WM0154 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,228 $1,500 Implemented
WM0154 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,436 $3,500 Implemented
WM0154 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $1,563 $0 Implemented
WM0154 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,697 $2,500 Not Implemented
WM0154 # 01 Y:2020 01 2020 REPLACE BOILER $58,212 $300,000 Not Implemented
BD0447 # 01 Y:2014 01 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,951 $20,000 Not Implemented
BD0447 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $197 $20 Not Implemented
BD0447 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,206 $3,300 Not Implemented
BD0447 # 08 Y:2014 08 2014 USE PHOTOCELL CONTROLS $444 $435 Not Implemented
BD0447 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $478 $350 Not Implemented
BD0447 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $608 $1,500 Not Implemented
BD0447 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $811 $200 Not Implemented
BD0447 # 04 Y:2014 04 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,048 $2,790 Not Implemented
BD0447 # 03 Y:2014 03 2014 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,852 $5,000 Not Implemented
BD0447 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,465 $7,100 Not Implemented