Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 3273 | Cement and Concrete Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0898 # 02 Y:2014 | 02 | 2014 | INSTALL SET-BACK TIMERS | $3,689 | $1,965 | Not Implemented |
OK0898 # 01 Y:2014 | 01 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $12,191 | $15,000 | Not Implemented |
OK0898 # 13 Y:2014 | 13 | 2014 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $10,867 | $27,400 | Not Implemented |
OK0898 # 12 Y:2014 | 12 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,273 | $45,000 | Not Implemented |
OK0898 # 11 Y:2014 | 11 | 2014 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $89,952 | $75,900 | Not Implemented |
OK0898 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $6,545 | $27,400 | Implemented |
OK0898 # 09 Y:2014 | 09 | 2014 | INSULATE BARE EQUIPMENT | $90 | $178 | Not Implemented |
OK0898 # 08 Y:2014 | 08 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,045 | $1,060 | Not Implemented |
OK0898 # 07 Y:2014 | 07 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $136 | $463 | Implemented |
OK0898 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,345 | $5,971 | Not Implemented |
OK0898 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,300 | $11,014 | Not Implemented |
OK0898 # 04 Y:2014 | 04 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $303 | $270 | Implemented |
OK0898 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,132 | $1,689 | Implemented |
OK0839 # 16 Y:2013 | 16 | 2013 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,380 | $0 | Not Implemented |
OK0839 # 12 Y:2013 | 12 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,901 | $4,994 | Not Implemented |
OK0839 # 11 Y:2013 | 11 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $32,511 | $25,606 | Implemented |
OK0839 # 10 Y:2013 | 10 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $80,680 | $63,370 | Not Implemented |
OK0839 # 09 Y:2013 | 09 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $873 | $490 | Implemented |
OK0839 # 08 Y:2013 | 08 | 2013 | INSTALL SET-BACK TIMERS | $921 | $1,630 | Not Implemented |
OK0839 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,708 | $5,684 | Implemented |
OK0839 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $3,677 | Not Implemented |
OK0839 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $506 | $3,114 | Not Implemented |
OK0839 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,494 | $33,218 | Implemented |
OK0839 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,395 | $1,750 | Implemented |
OK0839 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,540 | $0 | Implemented |