Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2013 |
Principal Product | Clay bricks |
NAICS | 327331 - Concrete Block and Brick Manufacturing |
SIC | 3251 - Brick And Structural Clay Tile |
Sales | $5,000,000-$10,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 110,043 |
Annual Production | 109,000,000 Pieces |
Production Hrs. Annual | 2,860 |
Location (State) | OK |
View Case Study |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $309,152 | 6,343,132 | kWh | $0.05 |
Electricity Demand | $108,655 | 18,300 | kW-months/year | $5.94 |
Natural Gas | $1,176,121 | 262,246 | MMBtu | $4.48 |
TOTAL ENERGY COSTS | $1,602,096 | |||
RECOMMENDED SAVINGS* | $196,355 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $69,125 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,514 Cost: $27,500 |
$7,514 | 153,343 | - | - | - | - | - | - | - | - |
$7,514 153,343 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,540 Cost: - |
$2,275 | 46,434 | $1,265 | 213 | - | - | - | - | - | - |
$2,275 46,434 kWh |
$1,265 213 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,395 Cost: $1,750 |
$2,395 | 48,878 | - | - | - | - | - | - | - | - |
$2,395 48,878 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,494 Cost: $33,218 |
$6,423 | 131,084 | $1,071 | 180 | - | - | - | - | - | - |
$6,423 131,084 kWh |
$1,071 180 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $506 Cost: $3,114 |
$506 | 10,332 | - | - | - | - | - | - | - | - |
$506 10,332 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $667 Cost: $3,677 |
$654 | 10,335 | $13 | 2 | - | - | - | - | - | - |
$654 10,335 kWh |
$13 2 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $2,708 Cost: $5,684 |
$1,617 | 33,019 | $1,091 | 183 | - | - | - | - | - | - |
$1,617 33,019 kWh |
$1,091 183 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $921 Cost: $1,630 |
- | - | - | - | - | - | $921 | 206 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$921 206 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS |
Savings: $873 Cost: $490 |
$521 | 10,642 | $352 | 59 | - | - | - | - | - | - |
$521 10,642 kWh |
$352 59 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $80,680 Cost: $63,370 |
- | - | - | - | - | - | $80,680 | 18,009 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$80,680 18,009 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $32,511 Cost: $25,606 |
$32,511 | 663,493 | - | - | - | - | - | - | - | - |
$32,511 663,493 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $4,901 Cost: $4,994 |
$4,901 | 100,001 | - | - | - | - | - | - | - | - |
$4,901 100,001 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $12,090 Cost: $11,638 |
- | - | - | - | $12,090 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,090 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,275 Cost: $912 |
- | - | - | - | - | - | $1,275 | 285 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$1,275 285 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,900 Cost: $4,158 |
- | - | - | - | - | - | $2,900 | 647 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,900 647 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $35,380 Cost: - |
- | - | - | - | - | - | - | - | $35,380 | 706,000 |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$35,380 706,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $196,355 Cost: $187,741 |
$59,317 | 1,207,561 | $3,792 | 637 | $12,090 | - | $85,776 | 19,147 | $35,380 | 706,000 | $59,317 1,207,561 kWh |
$3,792 637 kW-months/year |
$12,090 - $ |
$85,776 19,147 MMBtu |
$35,380 706,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $69,125 Cost: $105,886 |
$53,256 | 1,086,893 | $3,779 | 635 | $12,090 | - | - | - | - | - | $53,256 1,086,893 kWh |
$3,779 635 kW-months/year |
$12,090 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) |