IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 3273 Cement and Concrete Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0438 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,950 $0 Implemented
OR0438 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $3,000 Implemented
OR0438 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,260 $290 Not Implemented
OR0438 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,500 $150 Implemented
OR0438 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,850 $24,500 Implemented
OR0435 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,740 $1,070 Not Implemented
OR0435 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,400 $210 Implemented
OR0435 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $450 $0 Implemented
OR0435 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $501 $0 Implemented
OR0435 # 02 Y:2003 02 2003 MAKE A NEW BY-PRODUCT $33,850 $85,000 n/a
OR0435 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $44,700 $32,500 Implemented
OR0435 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,780 $150 Implemented
OR0435 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,300 $18,600 Implemented
UU0045 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,090 $886 n/a
UU0045 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,079 $320 n/a
UU0045 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,500 $550 n/a
UU0045 # 02 Y:2003 02 2003 OPTIMIZE PLANT POWER FACTOR $5,967 $0 n/a
UU0045 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $0 n/a
LM0061 # 11 Y:2003 11 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $360,180 $35,000 Implemented
LM0061 # 13 Y:2003 13 2003 MODIFY CURRENT INCENTIVE PROGRAM $34,000 $5,000 Implemented
LM0061 # 07 Y:2003 07 2003 AIR CONDITION ONLY SPACE NECESSARY $530 $0 Not Implemented
LM0061 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $320 $288 Not Implemented
LM0061 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,049 $1,281 Implemented
LM0061 # 08 Y:2003 08 2003 MAKE A NEW BY-PRODUCT $20,000 $300 Not Implemented
LM0061 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $430 Implemented