Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsNAICS | 327310 | Cement Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0571 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,526 | $55,952 | Implemented |
AS0571 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,102 | $20,000 | Not Implemented |
AS0571 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $22,882 | $38 | Implemented |
AS0571 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,525 | $34,427 | Implemented |
AS0571 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,292 | $908 | Implemented |
AS0571 # 06 Y:2024 | 06 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $492 | $511 | Implemented |
AS0571 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $430 | $987 | Not Implemented |
UF0582 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $506,910 | $647,662 | Not Implemented |
UF0582 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,793 | $79,204 | Implemented |
UF0582 # 11 Y:2022 | 11 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,868 | $12,700 | Not Implemented |
UF0582 # 05 Y:2022 | 05 | 2022 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $207,860 | $705,580 | Not Implemented |
UF0582 # 07 Y:2022 | 07 | 2022 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $32,856 | $29,990 | Not Implemented |
UF0582 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $226,296 | $102,253 | Implemented |
UF0582 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,379 | $0 | Not Implemented |
UF0582 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,189,637 | $2,090,000 | Not Implemented |
UF0582 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $3,357,648 | $12,825,000 | Not Implemented |
UF0582 # 10 Y:2022 | 10 | 2022 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $16,853 | $7,275 | Implemented |
UF0582 # 12 Y:2022 | 12 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $333,010 | $0 | Implemented |
UF0582 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,408 | $756 | Implemented |
LS2115 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,865 | $270 | Not Implemented |
LS2115 # 02 Y:2021 | 02 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $527 | $75 | Not Implemented |
LS2115 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $295 | $50 | Not Implemented |
LS2115 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,387 | $789 | Not Implemented |
LS2115 # 05 Y:2021 | 05 | 2021 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $844 | $300 | Not Implemented |
LS2115 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,076 | $451 | Not Implemented |