Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 327310 | Cement Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0582 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $3,357,648 | $12,825,000 | Not Implemented |
UF0582 # 12 Y:2022 | 12 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $333,010 | $0 | Implemented |
UF0582 # 11 Y:2022 | 11 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,868 | $12,700 | Not Implemented |
UF0582 # 10 Y:2022 | 10 | 2022 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $16,853 | $7,275 | Implemented |
UF0582 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,379 | $0 | Not Implemented |
UF0582 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,408 | $756 | Implemented |
UF0582 # 07 Y:2022 | 07 | 2022 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $32,856 | $29,990 | Not Implemented |
UF0582 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,793 | $79,204 | Implemented |
UF0582 # 05 Y:2022 | 05 | 2022 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $207,860 | $705,580 | Not Implemented |
UF0582 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $226,296 | $102,253 | Implemented |
UF0582 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $506,910 | $647,662 | Not Implemented |
UF0582 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,189,637 | $2,090,000 | Not Implemented |
UF0452 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,387 | $7,579 | Not Implemented |
UF0452 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,408 | $0 | Not Implemented |
UF0452 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,797 | $8,904 | Not Implemented |
UF0452 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,308 | $0 | Not Implemented |
UF0452 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $11,846 | $20,077 | Not Implemented |
UF0355 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,486 | $80,890 | Implemented |
UF0355 # 07 Y:2005 | 07 | 2005 | RECYCLE FLUORESCENT LAMPS | $625 | $3,496 | Implemented |
UF0355 # 06 Y:2005 | 06 | 2005 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $12,491 | $50,000 | Implemented |
UF0355 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,000 | $23,755 | Implemented |
UF0355 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,786 | $0 | Not Implemented |
UF0355 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,438 | $478 | Implemented |
UF0355 # 02 Y:2005 | 02 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $21,072 | $93,200 | Implemented |