Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164
matching recommendationsNAICS | 32733 | Concrete Pipe, Brick, and Block Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0839 # 13 Y:2013 | 13 | 2013 | OPTIMIZE PLANT POWER FACTOR | $12,090 | $11,638 | Implemented |
OK0839 # 14 Y:2013 | 14 | 2013 | INSULATE BARE EQUIPMENT | $1,275 | $912 | Not Implemented |
OK0839 # 15 Y:2013 | 15 | 2013 | INSULATE BARE EQUIPMENT | $2,900 | $4,158 | Not Implemented |
OK0839 # 16 Y:2013 | 16 | 2013 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,380 | $0 | Not Implemented |
TT0058 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,559 | $10,900 | Not Implemented |
TT0058 # 02 Y:2010 | 02 | 2010 | INSTALL SKYLIGHTS | $7,020 | $12,100 | Not Implemented |
TT0058 # 03 Y:2010 | 03 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,034 | $0 | Implemented |
TT0058 # 04 Y:2010 | 04 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $584 | $850 | Implemented |
MI0144 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,115 | $1,074 | Not Implemented |
MI0144 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,559 | $22,932 | Not Implemented |
MI0144 # 03 Y:2007 | 03 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,832 | $6,430 | Not Implemented |
MI0144 # 04 Y:2007 | 04 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,878 | $135 | Not Implemented |
MI0144 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,578 | $30 | Not Implemented |
CO0594 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,730 | $3,350 | Not Implemented |
CO0594 # 02 Y:2006 | 02 | 2006 | OPTIMIZE PLANT POWER FACTOR | $4,550 | $11,320 | Not Implemented |
CO0594 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,300 | $6,900 | Not Implemented |
CO0594 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $150 | $442 | Not Implemented |
CO0594 # 05 Y:2006 | 05 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $380 | $0 | Not Implemented |
CO0594 # 06 Y:2006 | 06 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,200 | $5,050 | Not Implemented |
CO0594 # 07 Y:2006 | 07 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,100 | $2,950 | Not Implemented |
CO0594 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $3,420 | Not Implemented |
CO0594 # 09 Y:2006 | 09 | 2006 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $950 | $500 | Not Implemented |
CO0594 # 10 Y:2006 | 10 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $360 | $90 | Not Implemented |
CO0587 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,250 | $4,140 | Implemented |
CO0587 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,000 | $270 | Implemented |