IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 32733 Concrete Pipe, Brick, and Block Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0045 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,079 $320 n/a
UU0045 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,090 $886 n/a
UU0045 # 02 Y:2003 02 2003 OPTIMIZE PLANT POWER FACTOR $5,967 $0 n/a
UU0045 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,500 $550 n/a
UU0045 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $0 n/a
LM0061 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,290 $1,000 Implemented
LM0061 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,642 $0 Not Implemented
LM0061 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $320 $288 Not Implemented
LM0061 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,049 $1,281 Implemented
LM0061 # 02 Y:2003 02 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $78,994 $149,000 Not Implemented
LM0061 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $430 Implemented
LM0061 # 07 Y:2003 07 2003 AIR CONDITION ONLY SPACE NECESSARY $530 $0 Not Implemented
LM0061 # 08 Y:2003 08 2003 MAKE A NEW BY-PRODUCT $20,000 $300 Not Implemented
LM0061 # 12 Y:2003 12 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $200,000 $7,500 Not Implemented
LM0061 # 09 Y:2003 09 2003 MODIFY STARTUP/SHUTDOWN TIMES $11,678 $25,000 Not Implemented
LM0061 # 10 Y:2003 10 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $42,240 $25,000 Not Implemented
LM0061 # 11 Y:2003 11 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $360,180 $35,000 Implemented
LM0061 # 13 Y:2003 13 2003 MODIFY CURRENT INCENTIVE PROGRAM $34,000 $5,000 Implemented
AS0353 # 07 Y:2003 07 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,106 $1,264 Implemented
AS0353 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,983 $300 Not Implemented
AS0353 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $279 $1,990 Implemented
AS0353 # 04 Y:2003 04 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $295 $1,000 Implemented
AS0353 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,388 $2,160 Implemented
AS0353 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,103 $570 Implemented
AS0353 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $4,873 Not Implemented