Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 32733 | Concrete Pipe, Brick, and Block Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0045 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,079 | $320 | n/a |
UU0045 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,090 | $886 | n/a |
UU0045 # 02 Y:2003 | 02 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,967 | $0 | n/a |
UU0045 # 03 Y:2003 | 03 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,500 | $550 | n/a |
UU0045 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,900 | $0 | n/a |
LM0061 # 06 Y:2003 | 06 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,290 | $1,000 | Implemented |
LM0061 # 05 Y:2003 | 05 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,642 | $0 | Not Implemented |
LM0061 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $320 | $288 | Not Implemented |
LM0061 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,049 | $1,281 | Implemented |
LM0061 # 02 Y:2003 | 02 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $78,994 | $149,000 | Not Implemented |
LM0061 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,107 | $430 | Implemented |
LM0061 # 07 Y:2003 | 07 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $530 | $0 | Not Implemented |
LM0061 # 08 Y:2003 | 08 | 2003 | MAKE A NEW BY-PRODUCT | $20,000 | $300 | Not Implemented |
LM0061 # 12 Y:2003 | 12 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $200,000 | $7,500 | Not Implemented |
LM0061 # 09 Y:2003 | 09 | 2003 | MODIFY STARTUP/SHUTDOWN TIMES | $11,678 | $25,000 | Not Implemented |
LM0061 # 10 Y:2003 | 10 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $42,240 | $25,000 | Not Implemented |
LM0061 # 11 Y:2003 | 11 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $360,180 | $35,000 | Implemented |
LM0061 # 13 Y:2003 | 13 | 2003 | MODIFY CURRENT INCENTIVE PROGRAM | $34,000 | $5,000 | Implemented |
AS0353 # 07 Y:2003 | 07 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,106 | $1,264 | Implemented |
AS0353 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,983 | $300 | Not Implemented |
AS0353 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $279 | $1,990 | Implemented |
AS0353 # 04 Y:2003 | 04 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $295 | $1,000 | Implemented |
AS0353 # 03 Y:2003 | 03 | 2003 | USE SYNTHETIC LUBRICANT | $1,388 | $2,160 | Implemented |
AS0353 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,103 | $570 | Implemented |
AS0353 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $892 | $4,873 | Not Implemented |