IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 327390 Other Concrete Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0535 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,698 $7,427 Not Implemented
AS0535 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,081 $17,428 Not Implemented
AS0535 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $539 $156 Implemented
AS0535 # 01 Y:2022 01 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,534 $44,427 Implemented
UU0207 # 08 Y:2022 08 2022 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $265 $750 Implemented
UU0207 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $626 $1,700 Implemented
UU0207 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $1,000 Implemented
UU0207 # 05 Y:2022 05 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,912 $1,585 Implemented
UU0207 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,008 $3,433 Implemented
UU0207 # 03 Y:2022 03 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,884 $750 Implemented
UU0207 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,250 $5,000 Not Implemented
UU0207 # 01 Y:2022 01 2022 USE SOLAR HEAT TO HEAT WATER $15,757 $75,487 Not Implemented
NL0063 # 05 Y:2022 05 2022 PAY BILLS ON TIME TO AVOID LATE FEES $377 $85 Not Implemented
NL0063 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $505 $2,425 Not Implemented
NL0063 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $2,400 Not Implemented
NL0063 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,901 $3,265 Not Implemented
NL0063 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $2,000 Not Implemented