IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
NAICS 32742 Gypsum Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0011 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,938 $5,753 Not Implemented
NT0011 # 02 Y:2023 02 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,571 $1,258 Not Implemented
NT0011 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,066 $10,060 Not Implemented
NT0011 # 04 Y:2023 04 2023 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $36,183 $19,507 Not Implemented
NT0011 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $3,788 $5,446 Not Implemented
NT0011 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,071 $0 Not Implemented
DL0224 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,584 $18,000 n/a
DL0224 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,258 $76,600 n/a
DL0224 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS $14,800 $70,000 n/a
DL0224 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,382 $780 n/a
MA0838 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $32,666 $1,500 Not Implemented
MA0838 # 02 Y:2022 02 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,878 $6,206 Implemented
MA0838 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,385 $65,000 Implemented
MA0838 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,501 $500 Implemented
MA0838 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,687 $6,969 Implemented
MA0838 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,706 $250 Implemented
WV0603 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $335,278 $8,838 Not Implemented
WV0603 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $153,514 $84,253 Not Implemented
WV0603 # 03 Y:2020 03 2020 DEVELOP A REPAIR/REPLACE POLICY $11,834 $1,018 Not Implemented
WV0603 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $10,297 $13,192 Not Implemented
WV0603 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $8,141 $1,391 Not Implemented
WV0603 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,058 $3,394 Not Implemented
WV0603 # 07 Y:2020 07 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,613 $30 Not Implemented
WV0603 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,300 Not Implemented
WV0603 # 09 Y:2020 09 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $546 $525 Not Implemented