IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 327420 Gypsum Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0601 # 08 Y:2023 08 2023 IMPROVE SPACE COMFORT CONDITIONING $34,014 $3,179 Implemented
UF0601 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,858,540 $0 Not Implemented
UF0601 # 02 Y:2023 02 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,202,647 $3,920,000 Implemented
UF0601 # 03 Y:2023 03 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $280,640 $30,000 Implemented
UF0601 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $32,141 $49,680 Implemented
UF0601 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,983 $0 Implemented
UF0601 # 06 Y:2023 06 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $74,558 $0 Implemented
UF0601 # 07 Y:2023 07 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $61,813 $29,295 Implemented
NT0012 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,463 $4,553 Not Implemented
NT0012 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $4,568 $1,441 Not Implemented
NT0012 # 03 Y:2023 03 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $315 $200 Not Implemented
NT0012 # 04 Y:2023 04 2023 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $13,612 $0 Not Implemented
NT0012 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $335 $0 Not Implemented
NT0012 # 06 Y:2023 06 2023 REDUCE SCRAP PRODUCTION $80,000 $20,000 Not Implemented
LS2313 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,862 $187 Implemented
LS2313 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,021 $180 Implemented
LS2313 # 06 Y:2023 06 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $87,048 $400,000 Implemented
LS2313 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,259 $150 Implemented
LS2313 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,049 $50 Implemented
LS2313 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $2,452 $75 Implemented
UF0600 # 03 Y:2023 03 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $4,976 $11,866 Implemented
UF0600 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,863 $38,735 Implemented
UF0600 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,830 $11,347 Not Implemented
UF0600 # 07 Y:2023 07 2023 IMPROVE SPACE COMFORT CONDITIONING $32,555 $3,179 Implemented
UF0600 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,508 $584 Implemented