Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
459
matching recommendationsNAICS | 3279 | Other Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0134 # 02 Y:2018 | 02 | 2018 | IMPROVE COMBUSTION CONTROL CAPABILITY | $19,372 | $15,000 | Not Implemented |
UU0134 # 01 Y:2018 | 01 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $599,971 | $264,049 | Not Implemented |
NC0609 # 01 Y:2018 | 01 | 2018 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $9,405 | $0 | Not Implemented |
NC0609 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,593 | $8,972 | Implemented |
NC0609 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $173 | $350 | Not Implemented |
NC0609 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $650 | $200 | Implemented |
NC0609 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $2,500 | Implemented |
NC0609 # 06 Y:2018 | 06 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,705 | $5,685 | Implemented |
WV0554 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,731 | $32,581 | Not Implemented |
WV0554 # 02 Y:2018 | 02 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $17,639 | $30,000 | Implemented |
WV0554 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,149 | $77,350 | Not Implemented |
WV0554 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $16,102 | $29,747 | Not Implemented |
WV0554 # 05 Y:2018 | 05 | 2018 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,868 | $1,000 | Implemented |
WV0554 # 06 Y:2018 | 06 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $6,147 | $21,264 | Implemented |
WV0554 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,081 | $5,593 | Implemented |
WV0554 # 08 Y:2018 | 08 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,406 | $632 | Implemented |
WV0554 # 09 Y:2018 | 09 | 2018 | MINIMIZE WATER USAGE | $1,354 | $700 | Implemented |
WV0554 # 10 Y:2018 | 10 | 2018 | INSTALL SET-BACK TIMERS | $974 | $2,132 | Not Implemented |
WV0554 # 11 Y:2018 | 11 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $424 | $133 | Implemented |
WV0554 # 12 Y:2018 | 12 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $221 | $516 | Implemented |
TR0007 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,558 | $3,000 | Implemented |
TR0007 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $5,927 | $22,500 | Implemented |
TR0007 # 03 Y:2018 | 03 | 2018 | RECYCLE FLUORESCENT LAMPS | $10,606 | $23,530 | Implemented |
TR0007 # 04 Y:2018 | 04 | 2018 | METER WASTE WATER | $6,760 | $2,650 | Not Implemented |
TR0007 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,572 | $500 | Implemented |