Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 3279 Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0116 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $46 $0 Implemented
CW0116 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $752 $70 Implemented
CW0116 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $1,350 Not Implemented
CW0116 # 05 Y:2020 05 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,030 $19,360 Not Implemented
CW0116 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $90 Implemented
CW0116 # 07 Y:2020 07 2020 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $438 $0 Implemented
CW0116 # 06 Y:2020 06 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,657 $2,615 Not Implemented
UD0925 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,964 $1,000 Implemented
UD0925 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,759 $5,000 Not Implemented
UD0925 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $4,804 $34,000 Not Implemented
UD0925 # 03 Y:2015 03 2015 USE OPTIMUM TEMPERATURE $46,665 $0 Not Implemented
UD0925 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $221,454 $15,345 Not Implemented
UD0925 # 01 Y:2015 01 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $860 $0 Implemented
UD0925 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,405 $66,200 Not Implemented
UD0925 # 08 Y:2015 08 2015 INSTALL SENSORS TO DETECT AND AVOID JAMS $7,714 $120,000 Implemented
UD0925 # 09 Y:2015 09 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,400 $0 Not Implemented
UD0869 # 09 Y:2012 09 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $64,740 $51,900 Not Implemented
UD0869 # 08 Y:2012 08 2012 COVER OPEN TANKS $1,504 $1,000 Not Implemented
UD0869 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,105 $400 Not Implemented
UD0869 # 03 Y:2012 03 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,665 $2,000 Not Implemented
UD0869 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $753 $825 Implemented
UD0869 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,400 $57,000 Not Implemented
UD0869 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,808 $1,000 Implemented
UD0869 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $4,610 $8,000 Not Implemented
UD0869 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,891 $0 Implemented