Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 3279 | Other Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0343 # 02 Y:2006 | 02 | 2006 | REDESIGN PROCESS | $54,257 | $30,000 | Not Implemented |
NC0343 # 03 Y:2006 | 03 | 2006 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $73,265 | $260,000 | Not Implemented |
NC0343 # 04 Y:2006 | 04 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,719 | $10,000 | Not Implemented |
NC0343 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $76,598 | $14,000 | Not Implemented |
NC0343 # 06 Y:2006 | 06 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,384 | $3,000 | Not Implemented |
NC0343 # 07 Y:2006 | 07 | 2006 | INSTALL SENSORS TO DETECT DEFECTS | $1,350,000 | $800,000 | Not Implemented |
NC0343 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $312 | $424 | Not Implemented |
NC0343 # 01 Y:2006 | 01 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $137,000 | $28,000 | Not Implemented |
AS0429 # 04 Y:2006 | 04 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $34 | $3,200 | n/a |
AS0429 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,127 | $1,000 | n/a |
AS0429 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $2,039 | $500 | n/a |
AS0429 # 01 Y:2006 | 01 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,688 | $1,000 | n/a |
AS0428 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $475 | $4,000 | n/a |
AS0428 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $614 | $300 | n/a |
AS0428 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,348 | $5,000 | n/a |
AS0428 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,252 | $1,500 | n/a |
AS0428 # 04 Y:2006 | 04 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,269 | $5,600 | n/a |
AS0428 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,918 | $2,500 | n/a |
AS0428 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,791 | $1,000 | n/a |
AS0428 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $15,000 | $0 | n/a |