Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 3279 | Other Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0182 # 10 Y:2016 | 10 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $836 | $600 | Implemented |
TT0182 # 09 Y:2016 | 09 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $1,612 | $500 | Implemented |
TT0182 # 08 Y:2016 | 08 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,822 | $1,500 | Implemented |
TT0182 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,896 | $3,000 | Not Implemented |
TT0182 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $6,416 | $19,000 | Implemented |
TT0182 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,956 | $5,000 | Implemented |
TT0182 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,314 | $4,000 | Implemented |
TT0182 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,055 | $53,270 | Implemented |
TT0182 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $12,836 | $61,050 | Not Implemented |
TT0182 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $13,618 | $20,200 | Not Implemented |
UK1604 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,425 | $67,500 | Not Implemented |
UK1604 # 10 Y:2016 | 10 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,729 | $6,000 | Not Implemented |
UK1604 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,645 | $1,200 | Not Implemented |
UK1604 # 08 Y:2016 | 08 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $56 | $61 | Implemented |
UK1604 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,094 | $5,000 | Implemented |
UK1604 # 06 Y:2016 | 06 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,304 | $3,620 | Implemented |
UK1604 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,018 | $3,500 | Implemented |
UK1604 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $153 | $280 | Implemented |
UK1604 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $166 | $196 | Not Implemented |
UK1604 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $14,750 | $8,715 | Implemented |
NC0563 # 01 Y:2016 | 01 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,357 | $3,050 | Not Implemented |
NC0563 # 02 Y:2016 | 02 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,026 | $500 | Not Implemented |
NC0563 # 03 Y:2016 | 03 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $3,304 | $7,184 | Implemented |
NC0563 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,577 | $230 | Not Implemented |
NC0563 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $680 | $100 | Not Implemented |