Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3279 | Other Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0116 # 06 Y:2020 | 06 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,657 | $2,615 | Not Implemented |
CW0116 # 05 Y:2020 | 05 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,030 | $19,360 | Not Implemented |
CW0116 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $46 | $0 | Implemented |
CW0116 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $138 | $90 | Implemented |
CW0116 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $752 | $70 | Implemented |
CW0116 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $342 | $1,350 | Not Implemented |
CW0116 # 07 Y:2020 | 07 | 2020 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $438 | $0 | Implemented |
WV0594 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $18,093 | $41,800 | Implemented |
WV0594 # 11 Y:2020 | 11 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $703 | $896 | Implemented |
WV0594 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,131 | $0 | Not Implemented |
WV0594 # 09 Y:2020 | 09 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,851 | $1,500 | Implemented |
WV0594 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,704 | $1,950 | Implemented |
WV0594 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,869 | $90 | Implemented |
WV0594 # 06 Y:2020 | 06 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $17,638 | $2,295 | Implemented |
WV0594 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $46,633 | $20,450 | Implemented |
WV0594 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $54,583 | $3,500 | Implemented |
WV0594 # 02 Y:2020 | 02 | 2020 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $94,912 | $539,790 | Not Implemented |
WV0594 # 01 Y:2020 | 01 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $126,819 | $150,000 | Not Implemented |
SU0497 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,000 | $0 | Not Implemented |
SU0497 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,107 | $51,554 | Implemented |
SU0497 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $302 | $510 | Implemented |
SU0497 # 06 Y:2020 | 06 | 2020 | ELIMINATE/REDUCE AN OPERATION | $1,415 | $1,857 | Not Implemented |
SU0497 # 05 Y:2020 | 05 | 2020 | REDUCE VENTILATION AIR | $1,191 | $882 | Implemented |
SU0497 # 04 Y:2020 | 04 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $177 | $5,032 | Implemented |
SU0497 # 03 Y:2020 | 03 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,235 | $257 | Implemented |