Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsNAICS | 32791 | Abrasive Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0190 # 05 Y:2010 | 05 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,758 | $4,871 | Not Implemented |
LE0293 # 01 Y:2009 | 01 | 2009 | USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED | $25,144 | $15,000 | Implemented |
LE0293 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,797 | $1,800 | Implemented |
LE0293 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,105 | $2,932 | Implemented |
LE0293 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $2,864 | $700 | Implemented |
LE0293 # 05 Y:2009 | 05 | 2009 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,697 | $27,600 | Implemented |
LE0293 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $717 | $1,675 | Implemented |
LE0293 # 07 Y:2009 | 07 | 2009 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $356 | $2,250 | Not Implemented |
LE0293 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,196 | $58,455 | Implemented |
NC0393 # 01 Y:2009 | 01 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $32,824 | $74,000 | Not Implemented |
NC0393 # 02 Y:2009 | 02 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,650 | $1,000 | Implemented |
NC0393 # 03 Y:2009 | 03 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,020 | $2,216 | Implemented |
NC0393 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $256 | $100 | Implemented |
NC0393 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $967 | $2,795 | Implemented |
UD0777 # 01 Y:2008 | 01 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $621,360 | $28,800 | Not Implemented |
UD0777 # 02 Y:2008 | 02 | 2008 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $468,137 | $140,000 | Not Implemented |
UD0777 # 03 Y:2008 | 03 | 2008 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $86,400 | $85,000 | Not Implemented |
UD0777 # 04 Y:2008 | 04 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $70,469 | $40,000 | Implemented |
UD0777 # 05 Y:2008 | 05 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $45,421 | $74,873 | Not Implemented |
UD0777 # 06 Y:2008 | 06 | 2008 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $35,664 | $50,000 | Implemented |
UD0777 # 07 Y:2008 | 07 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $35,347 | $15,000 | Implemented |
UD0777 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,252 | $1,000 | Implemented |
UD0777 # 09 Y:2008 | 09 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,821 | $1,900 | Not Implemented |
UD0777 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,188 | $28,755 | Not Implemented |
UD0777 # 11 Y:2008 | 11 | 2008 | USE MINIMUM STEAM OPERATING PRESSURE | $7,900 | $0 | Not Implemented |