Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2009 |
Principal Product | Coated abrasives |
NAICS | 327910 - Abrasive Product Manufacturing |
SIC | 3291 - Abrasive Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 139 |
Plant Area (Sq.Ft.) | 152,000 |
Annual Production | 56,000 Thousand Feet |
Production Hrs. Annual | 2,500 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $396,482 | 6,098,620 | kWh | $0.07 |
Natural Gas | $353,324 | 31,141 | MMBtu | $11.35 |
TOTAL ENERGY COSTS | $749,806 | |||
RECOMMENDED SAVINGS* | $71,717 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,893 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $32,824 Cost: $74,000 |
$(-9,662) | (-144,000) | $(-1,291) | (-576) | $43,777 | 3,857 | - | - | - | - |
$(-9,662) (-144,000) kWh |
$(-1,291) (-576) kW-months/year |
$43,777 3,857 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $31,650 Cost: $1,000 |
$31,650 | - | - | - | - | - | - | - | - | - |
$31,650 - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $6,020 Cost: $2,216 |
- | - | - | - | $6,020 | 530 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,020 530 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $256 Cost: $100 |
$676 | 10,080 | $60 | 27 | - | - | $(-300) | - | $(-180) | - |
$676 10,080 kWh |
$60 27 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-180) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $967 Cost: $2,795 |
$833 | 12,418 | $134 | 60 | - | - | - | - | - | - |
$833 12,418 kWh |
$134 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $71,717 Cost: $80,111 |
$23,497 | (-121,502) | $(-1,097) | (-489) | $49,797 | 4,387 | $(-300) | - | $(-180) | - | $23,497 (-121,502) kWh |
$(-1,097) (-489) kW-months/year |
$49,797 4,387 MMBtu |
$(-300) - $ |
$(-180) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,893 Cost: $6,111 |
$33,159 | 22,498 | $194 | 87 | $6,020 | 530 | $(-300) | - | $(-180) | - | $33,159 22,498 kWh |
$194 87 kW-months/year |
$6,020 530 MMBtu |
$(-300) - $ |
$(-180) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |