Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 32799 | All Other Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0116 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $138 | $90 | Implemented |
CW0116 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $752 | $70 | Implemented |
CW0116 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $342 | $1,350 | Not Implemented |
CW0116 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $46 | $0 | Implemented |
CW0116 # 05 Y:2020 | 05 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,030 | $19,360 | Not Implemented |
CW0116 # 06 Y:2020 | 06 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,657 | $2,615 | Not Implemented |
CW0116 # 07 Y:2020 | 07 | 2020 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $438 | $0 | Implemented |
UD0925 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $221,454 | $15,345 | Not Implemented |
UD0925 # 08 Y:2015 | 08 | 2015 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $7,714 | $120,000 | Implemented |
UD0925 # 01 Y:2015 | 01 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $860 | $0 | Implemented |
UD0925 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM TEMPERATURE | $46,665 | $0 | Not Implemented |
UD0925 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $4,804 | $34,000 | Not Implemented |
UD0925 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,759 | $5,000 | Not Implemented |
UD0925 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,964 | $1,000 | Implemented |
UD0925 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,405 | $66,200 | Not Implemented |
UD0925 # 09 Y:2015 | 09 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,400 | $0 | Not Implemented |
UD0869 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $753 | $825 | Implemented |
UD0869 # 02 Y:2012 | 02 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,891 | $0 | Implemented |
UD0869 # 04 Y:2012 | 04 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,400 | $57,000 | Not Implemented |
UD0869 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,808 | $1,000 | Implemented |
UD0869 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $4,610 | $8,000 | Not Implemented |
UD0869 # 03 Y:2012 | 03 | 2012 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $4,665 | $2,000 | Not Implemented |
UD0869 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,105 | $400 | Not Implemented |
UD0869 # 09 Y:2012 | 09 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $64,740 | $51,900 | Not Implemented |
UD0869 # 08 Y:2012 | 08 | 2012 | COVER OPEN TANKS | $1,504 | $1,000 | Not Implemented |