IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
NAICS 32799 All Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0429 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,127 $1,000 n/a
AS0429 # 04 Y:2006 04 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $34 $3,200 n/a
OK0716 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $10,863 $38,544 Not Implemented
OK0716 # 02 Y:2005 02 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,900 $200 Not Implemented
OK0716 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $-28,676 $0 Not Implemented
OK0716 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $1,725 $125 Not Implemented
OK0716 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $212 $475 Not Implemented
OK0716 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $579 $25 Not Implemented
OK0716 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $153 $1,346 Not Implemented
WI0483 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,449 $18,810 n/a
WI0483 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,950 $10,000 Not Implemented
WI0483 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,804 $500 Not Implemented
WI0483 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,164 $830 Implemented
WI0483 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,971 $2,186 Not Implemented
WI0483 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,886 $0 Not Implemented
WI0483 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $393 $40 Not Implemented
WV0306 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,489 $20,910 Not Implemented
WV0306 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $17,374 $5,922 Implemented
WV0306 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,768 $660 Not Implemented
WV0306 # 04 Y:2004 04 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,517 $370 Not Implemented
WV0306 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,967 $2,040 Implemented
WV0306 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,591 $420 Not Implemented
WV0306 # 07 Y:2004 07 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,120 $520 Not Implemented
WV0306 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $985 $160 Implemented
WV0306 # 09 Y:2004 09 2004 DEVELOP A REPAIR/REPLACE POLICY $934 $160 Implemented