IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
NAICS 32799 All Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0708 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,880 $460 Implemented
CO0708 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,260 $8,620 Not Implemented
CO0708 # 03 Y:2015 03 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,290 $500 Implemented
UM0459 # 03 Y:2015 03 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $299,710 $30,000 Implemented
UM0459 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $800 Not Implemented
UM0459 # 01 Y:2015 01 2015 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $115,156 $525,000 Not Implemented
UD0925 # 03 Y:2015 03 2015 USE OPTIMUM TEMPERATURE $46,665 $0 Not Implemented
UD0925 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $4,804 $34,000 Not Implemented
UD0925 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,759 $5,000 Not Implemented
UD0925 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,964 $1,000 Implemented
UD0925 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,405 $66,200 Not Implemented
UD0925 # 08 Y:2015 08 2015 INSTALL SENSORS TO DETECT AND AVOID JAMS $7,714 $120,000 Implemented
UD0925 # 09 Y:2015 09 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,400 $0 Not Implemented
UD0925 # 01 Y:2015 01 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $860 $0 Implemented
UD0925 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $221,454 $15,345 Not Implemented
UK1408 # 04 Y:2014 04 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $40,960 $204,000 Not Implemented
UK1408 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $36,000 $32,528 Implemented
UK1408 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $217,346 $140,476 Not Implemented
UK1408 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $580,500 $386,500 Not Implemented
UK1408 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,448 $2,000 Implemented
UK1408 # 01 Y:2014 01 2014 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $15,613 $3,894 Not Implemented
UK1408 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $7,600 $17,000 Not Implemented
WV0478 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,408 $7,000 Not Implemented
WV0478 # 11 Y:2013 11 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,342 $4,080 Not Implemented
WV0478 # 10 Y:2013 10 2013 DEVELOP A REPAIR/REPLACE POLICY $1,649 $643 Implemented