IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 32799 All Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0343 # 02 Y:2006 02 2006 REDESIGN PROCESS $54,257 $30,000 Not Implemented
NC0343 # 03 Y:2006 03 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $73,265 $260,000 Not Implemented
NC0343 # 04 Y:2006 04 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,719 $10,000 Not Implemented
NC0343 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,598 $14,000 Not Implemented
NC0343 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,384 $3,000 Not Implemented
NC0343 # 07 Y:2006 07 2006 INSTALL SENSORS TO DETECT DEFECTS $1,350,000 $800,000 Not Implemented
NC0343 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $424 Not Implemented
NC0343 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $137,000 $28,000 Not Implemented
AS0429 # 04 Y:2006 04 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $34 $3,200 n/a
AS0429 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,127 $1,000 n/a
AS0429 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,039 $500 n/a
AS0429 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,688 $1,000 n/a
AS0428 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $475 $4,000 n/a
AS0428 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $614 $300 n/a
AS0428 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $5,000 n/a
AS0428 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,252 $1,500 n/a
AS0428 # 04 Y:2006 04 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,269 $5,600 n/a
AS0428 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,918 $2,500 n/a
AS0428 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,791 $1,000 n/a
AS0428 # 01 Y:2006 01 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $15,000 $0 n/a